Rewa MĀKOHAKOHA pūmārō

20 Tau ahumahi Experience

Linyi Thunder rewa CO., Whakaturia Ltd i roto i 1998, kei roto i Linyi City, Shandong Province. motuhake to tatou wheketere kei roto i te rārangi o rewa pūmārō, tuku tatou whānui awhe o ngā hua, pērā i ngā waea taura, mekameka, turnbuckles, matau, mowhiti, thimbles, karekau, me te pera on.Focus i te whanaketanga whänuitanga, hanga tatou i te hononga pai ki mekameka wheketere, reti kotaha wheketere, wheketere poraka wīra, kawenga uwhi wheketere me ngā hua he kowiri tira wheketere, ki te whakarite i te hiahia rerekē o to tatou kiritaki ki te kounga pai, me te utu whakataetae.

 

pānui i atu

News & Events

ki a tatou
Use method and precautions of chain and chain rigging
Requirements for sling construction site
  • Use method and precautions of chain and c...
    20-09-15
    1. Before use, the working load and applicable scope of the chain rigging shall be clearly seen on the label. Overload use is strictly prohibited, and visual inspection of the chain rigging shall be carried out before use. 2. In normal operation, the hoisting Angle is the key affecting the load. The included Angle of the shadow part in the figure should not exceed 120 degrees at most, otherwise it will cause local overload of the chain rigging. 3. It is forbidden to use informal link between ...
  • Requirements for sling construction site
    20-09-01
    1. The construction site shall be equipped with enough spare slings of various sizes, which shall be hung at the specified place and put back to its original place after use.   2. Safety working load should be marked on the lute head of the sling, and the insertion rope sleeve should not be used.   3. Make a rope sleeve with a rope clip. The size of the rope clip must be in accordance with the size of the wire rope.   4. All spallers (including lifting rope, lifting lugs and sh...
pānui i atu
WhatsApp Online Chat!